Projects
ROADS & BRIDGES
SL No. | Name of the Project | Project Location | Name of the Client with Address | Start Date | Completion Date | Read More |
---|---|---|---|---|---|---|
01 | Post-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River. | Payrakhunju Ferryghat Over Paira River | Bangladesh Bridge Authority (BBA) Address: Bangladesh Bridge Authority, Bridge Building, New Airport Road, Banani, Dhaka-1212. | January 2023 | Ongoing | More |
02 | Consultancy for Preparation of Design and Related for 60 Meter Simply Supported PC Box Girder (with Sub-Structure, and Foundation) and 50-100-50-meter Balance Cantilever PC Box Girder (with Sub-structure and Foundation) for the Bridge Management Wing of Roads and Highways Department, Bangladesh. | Sarak Bhaban, Tejgaon | Roads and Highway Department. (RHD), Address: Sarak Bhaban, Tejgoan I/A, Dhaka -1208 | October 2022 | February 2023 | |
03 | Feasibility Study for Replacement of Dilapidated and Narrow Bailey Bridge at Important Points "(Chattogram Zone)". | Chattogram Zone (Khagrachari, Rangamati, Bandarban Division). | Roads and Highway Department. (RHD) Address: Sarak Bhaban, Tajgoan I/A, Dhaka - 1208 | June 2022 | February 2022 | More... |
04 | Pre-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River. | Payrakhunju Ferryghat Over Paira River | Bangladesh Bridge Authority (BBA) Address: Bangladesh Bridge Authority, Bridge Building, New Airport Road, Banani, Dhaka-1212. | June 2021 | August 2021 | |
05 | Detailed design and preparation of BOQ for 700m Long 8 Lane Prestressed Post-Tensioned Progressive Balanced Cantilever Bridge over Balu River, Madani Avenue to Shitallkhya connecting road. | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 | |
06 | Detailed design and preparation of BOQ 75m Long Post Tensioned Arch Bridge at Jalshiri-Ichapura connecting Road. | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 | |
07 | Detailed design and preparation of BOQ of 86 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 5 Finger Bridge (LB03), Jalshiri Link Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 | |
08 | Detailed design and preparation of BOQ of 80 m Precast Post Tensioned I Girder Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 | |
09 | Detailed design and preparation of BOQ of 60 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 3 Finger Bridge (LB02), Jalshiri Link Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 | |
10 | Detailed design and preparation of BOQ of 120 m prestressed CBD South Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan Address: Zia Colony Dhaka Cantonment, Dhaka - 1206 | April 2019 | April 2020 |
We Provide the Best Service in Industry
Add a line that tells users how easily they can get in touch with you