Projects

Overall Experience

SL No.Name of the ProjectProject LocationName of the Client with AddressStart DateCompletion DateRead More
01In-depth monitoring of the “Improvement of
Sirajganj-Kazipur-Dhunat-Sherpur (Z5401) and Sirajganj (Bagbati)-Dhunot (Sonamukhi) (Z-5405) Road to ppropriate
Standard and Width (1st Revised)”
Sirajgonj & Bogura Implementation,
Monitoring, and
Evaluation
Division (IMED)
November 2024June 2025
02Feasibility Study and Detailed Design for Construction of ‘B’ Class Railway Station at Birol Land Port.Birol Land Port, DinajpurBangladesh Railway, Bangladesh

November 2023April 2024More
03Post-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River.Payrakhunju Ferryghat Over Paira RiverBangladesh Bridge Authority (BBA)
January 2023June 2025More
04Consultancy for Preparation of Design and Related for 60 Meter Simply Supported PC Box Girder (with Sub-Structure, and Foundation) and 50-100-50-meter Balance Cantilever PC Box Girder (with Sub-structure and Foundation) for the Bridge Management Wing of Roads and Highways Department, Bangladesh.Sarak Bhaban, TejgaonRoads and Highway Department. (RHD)October 2022February 2023
05Feasibility Study for Replacement of Dilapidated and Narrow Bailey Bridge at Important Points "(Chattogram Zone)".Chattogram Zone (Khagrachari, Rangamati, Bandarban Division).Roads and Highway Department. (RHD)June 2022February 2022More...
06Consultancy Services for a feasibility Study of Rehabilitation/Maintenance of Railway Track and Feasibility study Along with a detailed design for the Rehabilitation/ Reconstruction of the Bridge in the Western zone of Bangladesh railwayRailway Western ZoneBangladesh Railway, Bangladesh
March 2022September 2022More...
07Consultancy services for a feasibility study of rehabilitation/maintenance of railway track and feasibility study along with detailed design for rehabilitation/ reconstruction of the bridge in the Eastern zone of Bangladesh railway.Railway Eastern ZoneBangladesh Railway, BangladeshFebruary 2022August 2022More...
08Pre-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River.Payrakhunju Ferryghat Over Paira RiverBangladesh Bridge Authority (BBA)June 2021August 2021
09Detailed design and preparation of BOQ for 700m Long 8 Lane Prestressed Post-Tensioned Progressive Balanced Cantilever Bridge over Balu River, Madani Avenue to Shitallkhya connecting road.Jalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
10Detailed design and preparation of BOQ 75m Long Post Tensioned Arch Bridge at Jalshiri-Ichapura connecting Road.Jalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
11Detailed design and preparation of BOQ of 86 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 5 Finger Bridge (LB03), Jalshiri Link BridgeJalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
12Detailed design and preparation of BOQ of 80 m Precast Post Tensioned I Girder BridgeJalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
13Detailed design and preparation of BOQ of 60 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 3 Finger Bridge (LB02), Jalshiri Link BridgeJalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
14Detailed design and preparation of BOQ of 120 m prestressed CBD South BridgeJalshiri Abasan24 Engineer Construction Brigade and Jalshiri AbasanApril 2019April 2020
15Consultancy for the Construction of the 2nd Bhairab Bridge Along with Approach Rail Lines at Ashuganj Railway Station, Ashuganj.Ashuganj Railway Station Bangladesh Railway, Bangladesh
December 2023OngoingMore