Projects
Overall Experience
| SL No. | Name of the Project | Project Location | Name of the Client with Address | Start Date | Completion Date | Read More |
|---|---|---|---|---|---|---|
| 01 | In-depth monitoring of the “Improvement of Sirajganj-Kazipur-Dhunat-Sherpur (Z5401) and Sirajganj (Bagbati)-Dhunot (Sonamukhi) (Z-5405) Road to ppropriate Standard and Width (1st Revised)” | Sirajgonj & Bogura | Implementation, Monitoring, and Evaluation Division (IMED) | November 2024 | June 2025 | |
| 02 | Feasibility Study and Detailed Design for Construction of ‘B’ Class Railway Station at Birol Land Port. | Birol Land Port, Dinajpur | Bangladesh Railway, Bangladesh | November 2023 | April 2024 | More |
| 03 | Post-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River. | Payrakhunju Ferryghat Over Paira River | Bangladesh Bridge Authority (BBA) | January 2023 | June 2025 | More |
| 04 | Consultancy for Preparation of Design and Related for 60 Meter Simply Supported PC Box Girder (with Sub-Structure, and Foundation) and 50-100-50-meter Balance Cantilever PC Box Girder (with Sub-structure and Foundation) for the Bridge Management Wing of Roads and Highways Department, Bangladesh. | Sarak Bhaban, Tejgaon | Roads and Highway Department. (RHD) | October 2022 | February 2023 | |
| 05 | Feasibility Study for Replacement of Dilapidated and Narrow Bailey Bridge at Important Points "(Chattogram Zone)". | Chattogram Zone (Khagrachari, Rangamati, Bandarban Division). | Roads and Highway Department. (RHD) | June 2022 | February 2022 | More... |
| 06 | Consultancy Services for a feasibility Study of Rehabilitation/Maintenance of Railway Track and Feasibility study Along with a detailed design for the Rehabilitation/ Reconstruction of the Bridge in the Western zone of Bangladesh railway | Railway Western Zone | Bangladesh Railway, Bangladesh | March 2022 | September 2022 | More... |
| 07 | Consultancy services for a feasibility study of rehabilitation/maintenance of railway track and feasibility study along with detailed design for rehabilitation/ reconstruction of the bridge in the Eastern zone of Bangladesh railway. | Railway Eastern Zone | Bangladesh Railway, Bangladesh | February 2022 | August 2022 | More... |
| 08 | Pre-Tendering services for the Construction of a Bridge on 17th km Kachua - Betagi-Patuakhali-Lohalia - Kalaya Road (Z-8052) at Payrakhunju Ferryghat Over Paira River. | Payrakhunju Ferryghat Over Paira River | Bangladesh Bridge Authority (BBA) | June 2021 | August 2021 | |
| 09 | Detailed design and preparation of BOQ for 700m Long 8 Lane Prestressed Post-Tensioned Progressive Balanced Cantilever Bridge over Balu River, Madani Avenue to Shitallkhya connecting road. | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 10 | Detailed design and preparation of BOQ 75m Long Post Tensioned Arch Bridge at Jalshiri-Ichapura connecting Road. | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 11 | Detailed design and preparation of BOQ of 86 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 5 Finger Bridge (LB03), Jalshiri Link Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 12 | Detailed design and preparation of BOQ of 80 m Precast Post Tensioned I Girder Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 13 | Detailed design and preparation of BOQ of 60 m Precast Post Tensioned I Girder bridge with architecturally aesthetical 3 Finger Bridge (LB02), Jalshiri Link Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 14 | Detailed design and preparation of BOQ of 120 m prestressed CBD South Bridge | Jalshiri Abasan | 24 Engineer Construction Brigade and Jalshiri Abasan | April 2019 | April 2020 | |
| 15 | Consultancy for the Construction of the 2nd Bhairab Bridge Along with Approach Rail Lines at Ashuganj Railway Station, Ashuganj. | Ashuganj Railway Station | Bangladesh Railway, Bangladesh | December 2023 | Ongoing | More |